Guangzhou, China · Manufacturing cosmetics since 2004

Sandio Cosmetics · Since 2004

Manufacturing & Equipment

Compounding, filling, sealing, assembly, manual boxing and packaging at Sandio Cosmetics in Guangzhou.

Last updated: October 2026

In short

Sandio Cosmetics handles compounding, filling, sealing, assembly, manual boxing and packaging at its 5,890 m² factory in Guangzhou. The production route is planned around the approved formula, component set and order quantity for each private label or custom formulation project.

Cosmetics filling suite with production staff and packaging equipment
Filling suite · Guangzhou factory
Inside manufacturing

From raw material to packed carton.

The process follows the approved product specification. Equipment details and site photos can be shared during a factory discussion.

  1. Compounding

    Raw materials are prepared according to the approved formula and batch requirements.

  2. Filling

    The bulk product is filled into the approved primary package for the order.

  3. Sealing

    Closures and seals are applied according to the component and finished-product requirements.

  4. Assembly

    Components, accessories and product units are assembled for the selected pack format.

  5. Manual boxing

    Finished units are packed into cartons and prepared for the next stage.

  6. Packaging

    Final packing follows the approved order specification and shipment plan.

Stainless-steel mixing and emulsifying tanks
Mixing and emulsifying
Packaging machinery and production staff in a filling room
Filling and packaging area
Production planning

What shapes the schedule?

The fastest route is not always the right one. Timing is confirmed after the specification is stable.

01

Formula readiness

Whether the project uses an available formula or requires custom development.

02

Packaging readiness

Component availability, artwork approval and label production all affect the start date.

03

Order quantity

Batch planning and filling time are scheduled against the confirmed order size.

Raw material procurement: typically 5 days after the requirements are confirmed. Final production timing is provided in the project quotation.

Next step

Discuss production requirements.

Share the formula, packaging and quantity you have in mind. We will confirm the manufacturing route.

Start a conversation

Tell us what you want to make.

Share your product idea, target quantity and market. Frank Feng will review your brief and reply within 24 hours, Beijing time, Monday to Saturday.

  • Private label MOQ: 500 pcs
  • Custom formula MOQ: 3,000 pcs
  • Factory in Baiyun District, Guangzhou

By sending this form, you agree to our privacy policy.

Chat with Frank